East Midlands motorway and trunk road works programme – Monday 11 January to Sunday 17 January 2010
M1 JUNCTION 25 TO JUNCTION 28 WIDENING
ONGOING – JUNCTION 25 TO JUNCTION 26
The north and southbound carriageways continue to be reduced to three narrow lanes with no hard shoulder and a 50mph speed limit from Junction 25 to 26.
ONGOING – JUNCTION 26 TO JUNCTION 27
The north and southbound carriageways continue to be reduced to three narrow lanes with no hard shoulder and a 50mph speed limit. Traffic will be running on the hard shoulder, lanes 1 and 2 both northbound and southbound.
ONGOING – JUNCTION 27 TO JUNCTION 28
The north and southbound carriageways continue to be reduced to three narrow lanes with no hard shoulder and a 50mph speed limit.
A1 PETERBOROUGH TO BLYTH JUNCTION IMPROVEMENTS
ONGOING – REPAIR WORKS TO BE CARRIED OUT AT A1/A614 BLYTH
The Highways Agency is carrying out repair work to the A1 at Blyth Junction (A1/A614) as a consequence of a major lorry fire incident that occurred at the junction.
Works will be required in early 2010 to repair concrete pipes affected by the fire and to clean up any contamination that is found. Further details will be confirmed when the programme and scope of repairs is fully determined.