Newsletter

Receive the latest news direct to your Inbox! Simply enter your email address below to sign up for our weekly newsletter.

Polls

Which of the following would you rate as the worst bad habit among your fleet drivers:

View Results

Fleet Directory

Saturday, March 20th 2010

1000s of fleet industry links
Essential for fleet managers and company car drivers

Mercedes-Benz B-Class B170 BlueEfficiency Sport road test

When it comes to building greener cars, everyone’s at it. Even premium carmakers like Mercedes-Benz are jumping on the bandwagon, with the launch of its Blue Efficiency range of cars. However, unlike most other manufacturers, Mercedes has decided to tweak its petrol-powered cars, rather than its diesels. It does this by the addition of a stop/start mechanism, as found in models from the likes of BMW. This new system will initially be found in A-, B- and C-Class models, but it’s likely that it will be rolled out on to other models in the future, starting with the E-class in 2010.

RSS news feed  Subscribe in a reader

Twitter iconFollow us on Twitter

Add your newsSend us your latest news - and put yourself in front of an audience of over two million users every month.

Performance

Mercedes-Benz B-Class The B170 BlueEfficiency is powered by a 1.7-litre, four-cylinder petrol engine that produces 114bhp and 114lb-ft of torque. The 0-62mph sprint is achieved in an unsprint-like 11.3 seconds, before pushing to a top speed of 114mph. 114 is clearly a significant number for this car. The performance is definitely what you’d call lack-lustre: the 0-62mph time, if anything, feels a bit on the generous side, as it seems to take forever for the dial on the speedo to reach it. There’s no real thrust from the torque to speak of, either, so the B170 moves along competently but it’s all a bit anodyne and uninspiring. Go elsewhere if you’re looking for thrills. The engine is mated to a five-speed manual gearbox that provides decent-enough shifts, but it could do with an extra cog, especially for driving on open roads and motorways.

Ride & Handling

Mercedes-Benz B-Class On the road, the B-Class is adequate but, we have to say, a little unimpressive. The ride isn’t great, which is not what you’d expect from a Mercedes-Benz. It gets a little too easily unsettled on poorly surfaced roads and doesn’t cope that well with the speed bumps that increasingly blight our urban landscapes. The torsion beam rear suspension is largely to blame here, suffering in comparison with the multi-link systems that are used on the likes of the Fords, Volkswagens and Audis. The body roll in the high-sided B170 isn’t that bad: it’s fairly well contained and cornering at speed shouldn’t prove too unsettling for occupants. The B170’s steering is a little on the light side for our taste when driving around town at low speed and it doesn’t get any better at higher speeds on more challenging roads, lacking accuracy in the bends and when cornering.

Build Quality & Reliability

Mercedes-Benz had a bit of a wobbly period for reliability a few years back, as a result of a cost-cutting programme. However, this is over now and the German carmaker has returned to building solid, high-quality cars. Indeed, the most recent JD Power customer satisfaction survey placed Mercedes sixth in the league table of 28 carmakers. The B-Class doesn’t show up in the JD Power table of most reliable popular cars, which is probably explained away by the fact that it doesn’t sell in large numbers in the UK, rather than because it’s particularly unreliable. However, the A-Class, which is the closest car in the Mercedes range in terms of shared components to the B-Class, did well, coming in 26th place. Quality is an issue, though, with the B-Class, despite a recent facelift: it still feels a bit like a cheap Merc, with materials that wouldn’t pass muster at Audi, for example.

Safety & Security

Safety is the one area in which the B170 excels. It comes out very well in crash testing by Euro NCAP, with five stars for adult occupant protection, four stars for child occupant protection and two stars for pedestrian protection. These scores are, in part, a result of a cleverly engineered car that has excellent side-impact protection and a special floor that allows the engine to slide underneath the cabin (instead of into it) in the event of an accident. There’s also a full complement of safety equipment on-board, including ABS with brake assist, ESP with Acceleration Skid Control, six airbags, active head restraints, Isofix child seat mount points, three-point seatbelts all round, seatbelt pre-tensioners, tyre pressure warning system, emergency lighting that responds to a crash and adaptive brake lights. For security, there’s an alarm system with immobiliser, central locking and locking wheel nuts.

Space & Practicality

The B170 certainly has a spacious, airy cabin, with lots of light. The steering column adjusts for height and reach and a height-adjustable driver’s seat, so achieving a comfortable driving position should be easy for anyone, whatever their size. In the back, there’s also a decent amount of head- and legroom, but it falls down in comparison with other compact MPVs – which, in essence, is what it is – because it only has five seats, rather than seven (or, in the Honda FR-V’s case, six). What it lacks in seating, though, it makes up for in bootspace: 544 litres with the seats up, expanding to 1,530 litres when the rear seats are folded. And if you find parallel parking a problem, you can add an optional parking assist system, that finds a space big enough for the car and steers it into position for you. Very nifty, but not cheap at £550.

Ownership & Value

This new BlueEfficiency model has been tweaked by Mercedes engineers to return better fuel economy and emit less carbon dioxide – but not by a huge amount. On the combined cycle, the B170 consumes 44.1mpg (an improvement of 2.6mpg) and CO2 emissions are an unspectacular 156g/km (a cut of 7g/km), placing it in Band G for road tax (£150 per year). When you compare these figures to those recorded by some of the competition – the BMW 116d’s 64.2mpg and 118g/km, the Ford Focus Econetic’s 65.7mpg and 114g/km, or the VW Golf Bluemotion’s 68.9mpg and 107g/km – you realise that Mercedes has some way to go. And it’s not as if you’ll get much of your money back on a B170 when you come to sell, either: residual values for the B-Class have traditionally been pretty low, so they’ve become known as something of a bargain as a second-hand car.

The latest road tests

Alfa Romeo Mito

Alfa Romeo Mito - Following on from Alfa’s popular new MiTo launched in 2009 comes the MiTo MultiAir. MultiAir is much more than a marketing buzzword as it unquestionably signifies a major advancement in petrol engine [...]

Vauxhall Insignia

Vauxhall Insignia - Vauxhall’s inspired replacement for the functional yet incredibly dull Vectra, the Insignia, has certainly blown away the design cobwebs at the manufacturer. It is without doubt one of the prettiest c [...]

Nissan NV200

Nissan NV200 - Nissan introduced the NV200 to the European market as a concept at the Hanover Motor Show back in 2008 and the production model has set the tone for its future LCV line-up. The NV200 is a nimble packa [...]

Toyota Auris

Toyota Auris - Launched in 2007 as the successor to the long-serving, record-selling Corolla, for 2010 the Auris has been restyled inside and out with revised suspension, newer Optimal Drive engines and spec enhance [...]

Skoda Roomster

Skoda Roomster - The Roomster is the least known of the current model line up at Skoda even though it has been an integral part of their family for several years and in many ways it’s easy to see why. There’s no doubt [...]

Ford Galaxy

Ford Galaxy - The Galaxy gains a new turbo petrol engine and twin-clutch gearbox, while the diesel engine line-up is also revised. Upgraded trim levels bring more standard equipment, but the Galaxy’s impressive sev [...]

An image of the 2008 Ford Focus.

The latest traffic information

M20 Junction 11 to 12, Folkestone – Improved Driving Conditions

Drivers in the Folkestone area can expect better conditions on the M20 during heavy rain after drainage channels between junctions 11 and 12 are replaced. The Highways Agency will be installing the drainage channels in a 1.9 mile (3km) section along the central reservation from Sunday 21 March, with work expected to last four weeks. [...]

Weekly Summary of Roadworks for M25 – 19/03/2010

A traffic management summary for both new and ongoing work All dates and times subject to weather conditions M25 Widening M25  Junction 17 to Junction 18 Both the clockwise and anti clockwise carriageways will be closed overnight from 10.00pm to 06.00am from Saturday 27 March 2010 until Sunday 28 March 2010 for new bridge works. [...]

Weekly Summary of Roadworks in Kent & Sussex – 19/03/2010

A traffic management summary for both new and ongoing work All of the following work is dependent on suitable weather conditions. M20 Junction 8 Ashford Road The A20 Ashford Road Bridge, which runs above the M20 junction 8 overbridge will be closed until late March. The work is being carried out to replace parapets, the safety [...]

North East roadworks update – 20th March – 26th March

A1M/A66M, Junction 57, County Durham Slight delays are expected overnight on the A1M at Junction 57 for signing and road marking works. There will be one lane open southbound on the A1M with a full carriageway closure with diversion on the A66M westbound between 8pm and 6am. The works will take place until 22 March. A1 [...]

Road Repairs on the A38 near Ashburton

Work to repair sections of road surface on the A38 between the Goodstone and Drumbridges junctions near Ashburton is due to take place later this month. Repairs in both directions on this three-and-a-half mile stretch of dual carriageway are scheduled to begin on 22 March and are due to be completed by 26 March. To [...]

Amended plans to improve A556 link

Further details of a major scheme to relieve congestion and improve safety for drivers travelling on the A556 between the M6 and M56 in Cheshire were published today by the Highways Agency. As well as benefiting the residents of Mere and Bucklow Hill by taking traffic away from these communities, the A556 Knutsford to Bowdon [...]

North East roadworks update – 20th March – 26th March

A1M/A66M, Junction 57, County Durham Slight delays are expected overnight on the A1M at Junction 57 for signing and road marking works. There will be one lane open southbound on the A1M with a full carriageway closure with diversion on the A66M westbound between 8pm and 6am. The works will take place until 22 March. A1 [...]

M2 Medway Bridge, Kent: Maintenance Inspections

To ensure that the M2 Medway Bridge is effectively maintained, the Highways Agency will be inspecting the bridge near junctions 1 to 3 on the M2 in Rochester, Kent from Monday 15 March until the end of May. Work will take place first on the coastbound carriageway and then later on the London-bound carriageway. All [...]

Boost to Economy as £8 Million Improvement Work On M4 Start Early

Advance work to improve safety and tackle congestion on the M4 in Berkshire started this month. Work is now underway on an improvement scheme to the M4 between junction 8/9 at Maidenhead and junction 10 at Wokingham costing £8 million – £4 million of which is Government fiscal stimulus funding. The Highways Agency is strengthening [...]

Highways Agency to install protective screens on Woodway Lane footbridge after objects thrown from bridge

From next Monday, the Highways Agency will begin work to install protective screens on the Woodway Lane footbridge which crosses the M6 between Junction 2 (Coventry) and Junction 3 (Bedworth). This follows repeated incidents of objects being thrown from the bridge, resulting in more than ten vehicles being struck. A local partnership, including the Highways [...]

Good News for Motorists – M4 Works between J18 and 19 completed eight days ahead of schedule

Work to replace 4.3 miles of steel central reservation barrier with a safer concrete barrier between junction 18 (Bath) and 19 (M32 Bristol) of the M4 has been completed a week ahead of schedule and half a million pounds under budget. A combination of careful planning and good weather has helped the project team complete [...]

New traffic lights for A628/A57 junction, Hollingworth

The Highways Agency will be carrying out work to install new traffic lights at the junction of the A628 and A57 in Hollingworth Village near Glossop. Work will start on Monday, 22 March and will be completed on 30 April. As well as installing new traffic lights, work will also take place to provide pedestrian [...]

West Midlands motorway and trunk road maintenance programme 15-21 March 2010

M6 Junction 14 (Stafford North) to Junction 13 (Stafford South) The southbound M6 between junction 14 and junction 13 will be closed overnight from 8.00pm to 6.00am from Saturday 20 March to Sunday 21 March for the removal of narrow lanes as part of hard shoulder strengthening. This will include the entry slip road at [...]

Yorkshire and the Humber Roadworks Update; Saturday 13 March to Friday 19 March

M1, Junction 30 (Barlborough) to Junction 31 (Aston), south of Sheffield Slight delays are expected on the M1 between Junction 30 (Barlborough) and Junction 31 (Aston) due to sign repair work. There will be two lanes closed on the northbound carriageway overnight from 9pm on 18 March until 5am on 19 March. M1, Junction 32 [...]

Overnight closures to install bridge beams over the A421

The project to improve safety and cut congestion on the A421 between Bedford and the M1 at Junction 13 moves a step forward next week, Monday 15 March, weather permitting, when work will begin to place the beams on the two new bridges at Marsh Leys Junction. The bridges are being built to carry the [...]

Roadworks information for Highways Agency roads in Cumbria and North Lancashire – 7 days beginning Monday 15th March 2010

ONGOING SCHEMES A595 West Lakes Science Park to Bigrigg (resurfacing and drainage) – traffic signals for resurfacing and drainage works. Work continues until the 26th March. M6 (Cumbria) Between Junctions 39 and 40 Shap to Penrith (bridge works) – various lane closures and contraflow in both directions for bridge improvements. Work continues until the 26th [...]

Roadworks information for Highways Agency roads in Greater Manchester, Merseyside, Cheshire and South Lancashire – 7 days beginning Monday 15th March 2010

ONGOING SCHEMES M57 Junction 2 to Junction 1 Prescot to Huyton (safety system) – overnight closure southbound from 22.00 to 05.00 between Monday 15th March and 19th March for installation of the MIDAS traffic safety system. M53 & A41 M53 Junction 4 to Junction 5 Bebington to Ellesmere Port and A41 junction with M53 Junction [...]

Highways Agency meet with project partners and local residents to address M6 work concerns

The Highways Agency are working closely with Walsall Council and the residents who live closest to the M6 roadworks near Junction 10 (Walsall) to find solutions to their concerns and develop new ways of working for the remainder of the project. Last week, the Highways Agency met with project partners Carillion and Mouchel at the [...]

North East roadworks update – 13th March – 19th March

A1M, Junction 62, County Durham Slight delays are expected overnight on the A1M at Junction 62 for CCTV camera installation works. There will be one lane open north and southbound on the slip roads and circulatory between 8pm and 6am. The works will take place until 13 March. A1 Newcastle Gateshead Western Bypass, [...]

M25 widening making good progress – work to start between junctions 18 and 21

The next stage of a major construction project to widen the M25 in Hertfordshire is being marked by public exhibition at Hunton Bridge in Abbots Langley. The Highways Agency is widening the motorway from three lanes to four between junction 16, for the M40, and junction 23, for the A1(M). The M25 is also being [...]